After-sales Service: | Lifetime Maintenance |
---|---|
Power Supply: | AC380V 50Hz 2kw |
Certification: | CE, ISO |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Product model | HT-CD-1126 |
Control method | Computer remote control + video surveillance; or plc touch screen control (customizable) |
Compatible with electric cell drop control | Independent drop control for a single drop arm; compatible cell drop test |
Space width automatic adjustment | 1. The size of the drop space can be automatically controlled by 0-2500mm according to the size of the battery pack |
2. Two drop arms, one fixed is adjustable up and down; the other drop arm is adjustable left and down | |
Fall height | 5,001,500 mm (customizable) |
Displacement accuracy | ±5mm |
Test space | W3000 * d2000 * h1000 mm (customizable) |
Load capacity | 1000 kg (customizable) |
Height control | Motor screw height control |
Measurement of elevation | The omron rotary encoder height measurement |
Drop control | Air-operated controller |
Speed up the open control | Pneumatic acceleration turns on the release drop control |
Fall direction | Face, diamond, angle |
Drop the floor | Trough steel + concrete, the thickness of the concrete is 200mm |
Synchronous short circuit control | Frequency converter + rotary encoder synchronous drop control |
Remote video surveillance | Surveillance cameras are installed in the laboratory to monitor the test status by remote video. The camera is no less than 5 million pixels and has a 1080p resolution |
Safety protection design | Overpressure protection; overload protection; with leakage protection device, limit limit, safety emergency stop switch, three-color light alarm indicator light |
Outline dimension | W4500 * d2500 * h2300 mm (subject to actual size) |
Weight of equipment | About 4,500 kg |
Device power supply | Ac380v 50hz 2kw |
Compressed gas source | ≥0.6mpa |
Installation conditions | 1. Ground load-bearing 1500 kg/m, dig drainage ditch around the ground equipment, drainage ditch section 300 * 300mm |
2. Lab space w6000 * d6000 * h5000mm | |
3. Lighting system is installed in the laboratory with an illumination level of 200 lumens | |
4. Equipped with fire water or tap water for battery packs for fire extinguishing | |
5. The top of the test area is installed to connect the smoke purification equipment, which is 4.5 meters away from the ground height and can not interfere with the crane. The laboratory volume of smoke purification exhaust volume is 90 times / h | |
6. Design the explosion-proof pressure relief outlet and fill air outlet in the laboratory | |
7. Equipped with cantilever crane need to dig pit w1500 * d1500 * h1500mm, buried into the cage, pouring and fixing |